Skip to main content

CCR Rule Compliance Data & Information

This website is intended to satisfy the requirement under the CCR Rule (§ 257.107) to maintain a publicly accessible internet site containing the information specified in that section. The required information will be posted for each generating station when it is accomplished and is available.                            

Generating Stations

Blue Valley Closed Impoundments
The Notice of Intent to Initiate Closure of the three ash ponds located at the Blue Valley Generating Station; the North Fly Ash Pond, South Fly Ash Pond and the Bottom Ash Pond was submitted to the Missouri Department of Natural Resources on December 16, 2015, as all CCR sluicing to the ponds ended September 09, 2015.  All three ponds were dewatered, closed and capped with a synthetic, impermeable liner as "Inactive CCR Surface Impoundments" by December 19, 2017, according to the definition and requirements set forth in EPA's 2015 CCR Rule, 40 CFR Part 257 Subpart D, paragraph 100 (§257.100).  By Rule, "Inactive CCR Surface Impoundment" closures must no longer receive CCR on or after October 19, 2015 and closure must be completed by April 17, 2018.
The documents, required by the Rule for this closure, will be posted as they are completed and can be viewed by clicking on the links below.  A hard copy of the documents can be obtained by following the instructions at the bottom of this page.

Required Documents

South Impoundment Deed Restriction

North Impoundment Deed Restriction

BV 1st CCR Closure

BV Ash Pond Notice of Intent to Initiate Closure

BV Notice of Closure Completion

IPL Post-Closure.pdf

IPL Closure Report

2021 CCR Impoundment Annual Groundwater Report

2022 CCR Impoundment Annual Groundwater Report

2023 CCR Impoundment Annual Groundwater Report

2020 Site Characterization Report

Groundwater Sampling and Analysis Plan

Post-Closure Care Plan

Seepage and Stability Evaluation

Impoundments Cap Design Specifications

Impoundments Cap Design Drawings

2016 Land Disturbance SWPP

Baseline Groundwater Statistical Summary Report

The City of Independence sold this station and all associated properties to Missouri City Acquisition in 2017.

The Notice of Intent to Initiate Closure of  the ash pond located at the Missouri City Generating Station was submitted to the Missouri Department of Natural Resources on September 25, 2015.  The pond was dewatered, closed and capped with an impermeable liner as an Inactive CCR Surface Impoundment by September 27, 2016 according to the definition and requirements set forth in EPA's 2015 CCR Rule, 40 CFR Part 257 Subpart D, paragraph 100 (§257.100).  By Rule, "Inactive CCR Surface Impoundment" closures must no longer receive CCR on or after October 19, 2015 and closure must be completed by April 17, 2018.

On August 24, 2017, the City of Independence completed the divestiture of its Missouri City Generating Station, the closed CCR Impoundment, and all related properties to Missouri City Acquisition, LLC (City Ordinance No. 18773).  Any coal combustion residual questions/requests related to the Missouri City Generating Station should be directed to John Diehl of Missouri City Acquisition, LLC at (314) 241-0900.  

A groundwater monitoring and evaluation program around the former impoundments is being conducted under State Operating Permit MO-00115924, Special Condition C.16 located at Missouri Operating Permit MO-0115924

A printed copy of any of the completed documents on this page is available by following the City’s Request for Open Records process described here.