The area generally north of 23rd St. and west of Noland Rd.
Project | Status |
---|---|
8" Ash Ave. & 18th St.Ash Ave. (Intersection of 16th St. & Maywood Ave. to 18th St.) & 18th St. (Ash Ave. to Maywood Ave.) | Design |
Contact Basin PaintingCourtney Bend Water Treatment Plant | In-Progress |
Filter RehabilitationCourtney Bend Water Treatment Plant | Acquisition |
Lime Slaker AdditionCourtney Bend Water Treatment Plant | Design |
Roof Replacement - Reservoir Pump Houses39th Street Reservoir, 35th Street Reservoir, Van Horn Reservoir, Courtney Bend Treatment Plant | Pre-Construction |
The area generally north of 23rd St. and Truman Rd. and east of Noland Rd.
Project | Status |
---|---|
12" D.I. Water Main on Truman Rd.Truman Rd. from Powell Rd. to M-78 Highway | Pre-Construction |
6" D.I. Water Main on E 3rd St. N & N Jennings Rd.3rd St. N (Gilbert St. to dead end) & Jennings Rd. (3rd St. N to Gilbert St.) | Design |
6" D.I. Water Main on Trail Ridge Dr. & Pacific Ave.Trail Ridge Dr. (23rd St. to Pacific Ave.) and Pacific Ave. (Trail Ridge Dr. to Ellison Way) | Design |
8" D.I. Water Main on Salisbury Rd.Salisbury from Peck to East of Sports Complex | Pre-Construction |
The area generally south of Truman Rd. and 23rd St. and east of Lee's Summit Rd., also the area bordered by Noland and Lee's Summit Roads and 23rd and 35th Streets.
Project | Status |
---|---|
12" D.I. Water Main on 23rd St.23rd from James Downey Rd. to Redwood Ave. | Design |
39th Street Reservoir Rehabilitation39th Street Reservoir | Acquisition |
6" D.I. Water Main on Bellevista Dr./Leslie Ave. & Rankin Rd.Bellevista Dr./Leslie Ave. (Leslie Ave. to Partridge Ave.) & Rankin Rd. (Red Rd. to Pearl St.) | Design |
8" D.I. Water Main on Gudgell AveGudgell from Dodgion Ave. to Kings Highway | Construction |
The area generally south of 23rd St. and west of Noland Rd., also the area bordered by Noland and Lee's Summit Roads and 35th St. and 40 Hwy.
Project | Status |
---|---|
6" D.I. Water Main on Northern Blvd.Northern from 35th St. to Blue Ridge Blvd. | Design |
6" D.I. Water Main on Ralston Ave.Ralston from 31st St. to 29th St. | Design |
6" D.I. Water Main on Sheley Rd.Sheley Rd. from Claremont Ave. to Norwood Ave. | Design |
6"/10" D.I. Water Main on Hall Rd. & Westport Rd.Hall Rd. (23rd St. to Westport Rd.) & Westport Rd. (Hall Rd. to Hawthorne Ave.) | Design |