Bellevista Neighborhood Drainage

Project Name: Bellevista Neighborhood Drainage
Location:

Description:

As a result of the analysis for the Crackerneck Watershed Study and subsequent investigations, the need for comprehensive neighborhood storm drainage improvements was determined. The 1st phase will be the study and design in 2006-2007 and construction in 2008-2009. Prepare an Engineering study to evaluate the flooding problem along with alternatives to mitigate. Design will then be performed on the recommended alternative with the most benefit, cost effectiveness and constructibility.


Last Report Date:
Project Status: Complete